Ranked as the 25th busiest airport in North America, the Salt Lake City International Airport’s redevelopment program is currently the largest project we have in progress, with 1,750 workers on deck and an expected cost of $3.1 billion. Our SuperTie™ 6K Smooth Fiberglass Wall Form Tie and Gripper System have been used in the various sizes of ceiling beams in their airport parking structure as part of their program’s goal of “constructing new facilities, rehabilitating certain structures, as well as constructing improved roadways and associated infrastructure.” The first phase of this construction project is now 50% complete and expected to be completed by 2020.
Our fiberglass ties are chosen time and time again due to their ability to be cut to length on-site and to be cut flush with the concrete, decreasing wall-forming labor costs from eliminating the need for construction crews to tediously climb up and down ladders to strip and patch, which is required with alternative steel ties.
Location
776 N Terminal Dr
Salt Lake City, UT 84122
Partners
General Contractor — HOLDER | BIG-D A JOINT VENTURE
RJD Industries Products
SuperTie™ 6K Smooth Fiberglass Wall Form Tie and Gripper System
- SuperTie™ 6K Smooth Fiberglass Wall Form Tie and Gripper System as seen in the ceiling beams.
- A closer look at our SuperTie™ 6K Smooth Fiberglass Wall Form Tie and Gripper System in the ceiling beams before being cut flush.
- On-site at the Salt Lake City International Aiport
- Our SuperTie™ 6K Smooth Fiberglass Wall Form Tie and Gripper System comes in a variety of colors to blend in with every concrete color.